Metrobloks is developing a three-building data center campus at Little Island, Cork, anchored by a completed 85,163 sq ft cold shell. DC1 combines a 9.5 MVA grid import with 15.75 MW of on-site gas generation to deliver 18.7 MW of Critical IT from Q3 2027, with rack positions above 200 kW designed for next-generation GPUs. Private secure suites are available in the multi-tenant buildings.
Dublin has been closed to new data center grid connections since 2021, and national policy now steers new capacity to regions like Cork — Ireland's second city, home to over 200 multinationals and more than 5 GW of planned offshore wind. ORK-A serves Ireland, the UK and Western Europe: approximately 12 million people live within 250 miles, and an estimated 130 million are reachable within 20 milliseconds round trip.
Superior Connectivity and Resilient Design
Hybrid power built for density
DC1 pairs a 9.5 MVA grid connection with 15.75 MW of on-site gas generation, allocatable to DC1 or across DC1 and DC2. The design supports rack positions above 200 kW on a 1.35 PUE basis, with hybrid direct liquid and air cooling tailored to each deployment.
Delivered in phases across a 22-acre freehold campus
Capacity comes in increments of 1.5 or 2 MW IT, with block or distributed redundancy and a 400 V AC or 800 V DC architecture. DC1 delivers 18.7 MW of Critical IT from Q3 2027. DC2 adds 7.0 MW by Q2 2028 on a fully consented 99,077 sq ft site, and DC3 adds approximately 74 MW from 2029, taking the campus to roughly 100 MW at full build-out.







.jpg)
DC1 delivers 18.7 MW of Critical IT from Q3 2027, the first phase of a 22-acre campus with full planning consent across all three buildings. The phased roadmap allows customers to secure capacity now and scale as DC2 and DC3 come forward, without relocating or redesigning infrastructure.